Speaking for geekery fans, please do. I still do occasional tower gigs for the company for whom I used to work. Their tallest towers are a measly 180 feet, but I had to climb a 400-footer to remove a customer's gear once.
My rigging is beyond simple for these little jobs; just a couple of ropes and a sheave or two for changes of direction to avoid other gear on the tower. But I've watched with some interest and awe the guys from full-time tower rigging companies. Always interested in that. :)
Consider this another vote for the detailed breakdown of the rigger's cleverness.
I've spent a fair bit of time this week watching the crew at work placing the new back-up generators and associated gear. Building the counter-weight for the 300 ton Liebherr was most interesting.
Makes me wish I'd gotten stills/video of them dropping the building over the first gen set. with two inches of clearance from the control building next to it. With winds gusting 5-15 mph.
I swear that crew could thread a needle with that thing.
Comment moderation is enabled. Your comment will not be visible until approved. Arguing or use of insulting or derogatory language will result in your comment going unpublished: no name-calling. Comments I deem excessively partisan will not be published.
Speaking for geekery fans, please do. I still do occasional tower gigs for the company for whom I used to work. Their tallest towers are a measly 180 feet, but I had to climb a 400-footer to remove a customer's gear once.
ReplyDeleteMy rigging is beyond simple for these little jobs; just a couple of ropes and a sheave or two for changes of direction to avoid other gear on the tower. But I've watched with some interest and awe the guys from full-time tower rigging companies. Always interested in that. :)
I've got all day, go for it. Seems like an interesting subject.
ReplyDeleteAre you up here playing on the North campus today? Fun! :)
ReplyDeleteConsider this another vote for the detailed breakdown of the rigger's cleverness.
ReplyDeleteI've spent a fair bit of time this week watching the crew at work placing the new back-up generators and associated gear. Building the counter-weight for the 300 ton Liebherr was most interesting.
BGM
I think -- I hope! -- you'll be pleased with tomorrow's edition, then.
ReplyDeleteMakes me wish I'd gotten stills/video of them dropping the building over the first gen set. with two inches of clearance from the control building next to it. With winds gusting 5-15 mph.
ReplyDeleteI swear that crew could thread a needle with that thing.